ARAI

OUR
PROJECTS.

Home > Our Projects

01

ATAL Setu
(Mumbai Trans Harbour Link).

ARAI™ executed the electrical works for Mumbai’s iconic ATAL Setu – India’s longest sea bridge, spanning 21.8 km and connecting Mumbai to Navi Mumbai. This landmark project showcases our capability to deliver large-scale, complex infrastructure with a strong focus on safety, reliability, and enhanced connectivity.

02

Mumbai Metro Line 3
(Under Ground).

ARAI™ Associates in collaboration with L&T executed extensive Electrical and ITC (Information, Telecommunication & Control) works for Package-1 at Churchgate, Vidhan Bhawan & Hutatma Chowk underground stations along with associated up-line and down-line tunnel sections.

04

Mumbai Metro
Line 12 .

In collaboration with Gawar Constructions Ltd, ARAI™ Associates is executing electrical works for Mumbai Metro Line 12 (Orange Line Extension), an under-construction corridor enhancing suburban connectivity between Kalyan and Taloja.

05

BDD Chawl
Redevelopment.

Originally constructed by the British Government between 1920 and 1925, this historic site is currently undergoing a massive redevelopment led by MHADA to modernize local infrastructure.

The ambitious project features high-rise residential towers reaching 42 and 85 storeys, with ARAI (Automotive Research Association of India) providing specialized consultancy for the electrical systems and engineering works.

ABOUT

About Brand.

ARAI Brands

ARAi ASSOCIATES

ARAI™ Associates is dedicated to Public Sector Projects, significantly contributing to Infra Development. 

ARAi INFRA LLP

ARAI™ Infra LLP provides tailored MEP Construction and Consultancy services for the Private Sector, serving corporate and industrial clients with building infrastructure.